Close

Siemens Power deal: FG to collaborate with Egypt

Nigeria is set to collaborate with Egypt towards a total overhaul of the power grid and distribution systems.

FG set to create at least 5 million jobs for youths in the power sector – Minister of Power , Consortium of Western investors to inject upwards of $5 billion in Nigeria's renewable energy sector, Power: Nigeria's deal with Siemens - the birth of a new era?

President Muhammadu Buhari ordered the Ministry of Power to work with the Egyptian government on an effective rollout of the  Presidential Power Initiative with German engineering company Siemens AG.

This was disclosed by Mr. Aaron Artimas, Special Adviser, Media and Communication to the Minister of Power,  in a statement in Abuja on Monday.

The Special Adviser revealed that the Minister of Power, Mr. Sale Mamman, disclosed this in a meeting with the  Egyptian Ambassador to Nigeria, Mr. Ihab Awad, citing that the FG wants to learn from Egypt’s successful implementation of a power upgrade with Siemens AG.

READ: Plan to overhaul Nigeria’s Power grid attracts investors – Siemens

“The President had reasoned that obtaining more information from Egypt will enable Nigeria to maximize our agreement with Siemens, towards the total overhaul of our power grid and distribution systems,” he said.

The Power Minister said that the FG would leverage on Egypt’s rollout programme also and added that both countries would also collaborate on renewable energy, and improving other sectors of the electricity value chain.

What you should know 

  • Nairametrics reported that the FG  and Siemens AG have signed a contract for the pre-engineering phase of the Presidential Power Initiative.
  • In 2018, Siemens, Elsewedy Electric, and Orascom Construction launched a 14.4 GW  project under 30 months including the largest combined cycle megaprojects in Beni Suef, Egypt.




Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Leave a Reply

Your email address will not be published. Required fields are marked *