Close

Lagos to shut Ojota’s axis of main carriage way of Ikorodu road for 3 months

The Commissioner advised all motorists to utilize alternative routes suggested during the stipulated time.

BUS, Lagos to close Ilupeju, Jibowu-Yaba axis for railway project, Lagos shuts Ketu-Mile 12 section of Ikorodu road, outlines alternative routes, Motorists to pay N1000 penalty at Lekki-Ikoyi Toll Plaza
Frederic Oladeinde

The Lagos State Government has announced the shutdown of the entire length of the main carriageway of Ikorodu Road from Ojota interchange to Ojota Second Pedestrian Bridge from Monday, September 21, 2020, for a duration of 3 months.

This is development is part of the next phase ongoing rehabilitation work on Ikorodu Road which is set to commence from the Ojota Interchange to Ojota Second Pedestrian Bridge and the Service lane inbound Lagos.

READ: FG, Lagos State collaborate to address declining infrastructure in Festac Town

While making the disclosure, the Lagos State Commissioner for Transportation, Dr Frederick Oladeinde, advised all motorists to utilize alternative routes suggested during the stipulated time for the repairs following the closure of the entire length of the main carriageway for reconstruction work.

Oladeinde in his statement said, “Vehicles coming from Maryland will be diverted at Odoyalaro into the Service lane and the BRT Corridor to link back the main carriageway at Ketu bus stop and Demurin junction respectively.’’

READ: Lagos allows cinemas, gyms, others to reopen

The commissioner gave an assurance that the Lagos State Traffic Management Authority (LASTMA) and other law enforcement agencies will be available to direct traffic for free vehicular movement during the entire period of construction work.

While soliciting for the cooperation and support of residents and motorists that ply the axis, the Commissioner stated that the project is aimed at finding a lasting solution to the ever-busy road as well as to achieve the present administration’s traffic management and transportation policy objectives.

Explore the Nairametrics Research Website for Economic and Financial Data





Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Leave a Reply

Your email address will not be published. Required fields are marked *