Close

Abaji Water Factory: FCMB Guarantees Nestle’s N5.7 billion Loan

By Guaranteeing the loan they carry a risk of paying Bank of Industry all or part of the loans that Nestle defaults on if any.

  • Nestle Nigeria Plc recently commissioned a new water factory in Abaji Abuja over the weekend.
  • The Factory was commissioned by President Buhari who was represented by the Vice President
  • The Managing Director of Nestle, Mr Dharnesh Gordhon, said that the factory is the first major investment that have had in the North and the third in Nigeria.
  • It is also viewed as the most modern water processing plant in Central and West Africa.
  • The factory will produced bottled water and will be the second after their existing factory in Agbara Ogun State.
  • According to reports, the loan used to build the factory was provided by the Bank of Industry which typically lends at a single digit interest rate. The loan is therefore guaranteed by FCMB
  • In exchange for guaranteeing the loan, FCMB will earn fees on the transaction.
  • By Guaranteeing the loan they carry a risk of paying Bank of Industry all or part of the loans that Nestle defaults on if any.

     





Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Leave a Reply

Your email address will not be published. Required fields are marked *