Close

Shell Commence Production From Bonga Phase 3 Project In Nigeria

Bonga phase 3 is an expansion of bonga main development, with peak production expected to be some 50,000 barrels of oil equivalent Bonga phase has capacity to produce more than 200,000 barrels of oil and 150 million standard cubic feet of gas a day  Shell commences production from bonga phase 3 project in nigeria Bonga […]

Oil Mining Lease 11, OML 11, Nigerian National Petroleum Corporation, Shell Petroleum Development Company, SPDC, NNPC
  • Bonga phase 3 is an expansion of bonga main development, with peak production expected to be some 50,000 barrels of oil equivalent
  • Bonga phase has capacity to produce more than 200,000 barrels of oil and 150 million standard cubic feet of gas a day
  •  Shell commences production from bonga phase 3 project in nigeria
  • Bonga phase 3 is an expansion of bonga main development, with peak production expected to be some 50,000 barrels of oil equivalent Further company coverage

 





Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Leave a Reply

Your email address will not be published. Required fields are marked *