Close

[HOPE DASHED] Second Niger Bridge Can No Longer Meet Completion Date

The second Niger Bridge will not be completed and ready for use until 2020, Uche Orji, Managing Director and CEO of Nigerian Sovereign Investment Authority (NSIA), has said. The bridge flagged off on March 2014 by former President Goodluck Jonathan was initially billed for completion in March 2018. Orji who briefed President Muham­madu Buhari yesterday, on […]

[HOPE DASHED] Second Niger Bridge Can No Longer Meet Completion Date
Second Niger Bridge Prototype
  • The second Niger Bridge will not be completed and ready for use until 2020, Uche Orji, Managing Director and CEO of Nigerian Sovereign Investment Authority (NSIA), has said.
  • The bridge flagged off on March 2014 by former President Goodluck Jonathan was initially billed for completion in March 2018.
  • Orji who briefed President Muham­madu Buhari yesterday, on the Second Niger Bridge, health care, agriculture, power and other activities of the NSIA, the sum of $2.2 million has been spent on the project preparatory state of the bridge alone.
  • While speaking to State House correspondents, he said the volatile oil prices have prevented the Federal Government from contributing to the NSIA), after the initial deposit of $1billion in seed capital from the nation’s excess crude account by the Jonathan-led administration, to kick off the fund in 2013.
  • He however, said despite the lack of funding, the NSIA had so far made a turnover of N15.7 billion prof­it, and that they had briefed the President on alternative ways of supporting the fund, which will be made known to the public when the time is right.




Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Leave a Reply

Your email address will not be published. Required fields are marked *