Close

Two More NLNG Cargoes Head For Spanish Terminals

Ship tracking data has shown that two tankers carrying LNG from Nigeria LNG (NLNG) are due to berth at Spanish regasification terminals today, Platts reports. The 148,300 cu m LNG Imo vessel is due at Spain’s 11.8 Bcm/year Cartagena terminal, while the LNG Ogun – with a capacity of 149,600 cu m – is expected […]

Two More NLNG Cargoes Head For Spanish Terminals
  • Ship tracking data has shown that two tankers carrying LNG from Nigeria LNG (NLNG) are due to berth at Spanish regasification terminals today, Platts reports.
  • The 148,300 cu m LNG Imo vessel is due at Spain’s 11.8 Bcm/year Cartagena terminal, while the LNG Ogun – with a capacity of 149,600 cu m – is expected at the 7 Bcm/year Bilbao terminal, according to best estimates from Eclipse Energy, an analytics unit of Platts.
  • On Saturday, the 156,000 cu m WilForce — which also loaded a cargo at Nigeria LNG — reached the 8.8 Bcm/year Sagunto terminal, Eclipse data showed.
  • The two new confirmed arrivals will bring Spain’s total LNG imports so far this month to 960,000 cu m in eight cargoes, according to nominations from Spanish transmission system operator Enagas.

Source: Platts.com





Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Leave a Reply

Your email address will not be published. Required fields are marked *