Close

Shell reopens Trans Nigeria Pipeline

Shell reopened on May 16 the Trans Nigeria pipeline that feeds Bonny Light crude oil to the export terminal, a spokeswoman said on Monday. The pipeline, which has the capacity to carry 180,000 barrels of crude oil per day, was closed on May 12 following a leak caused by attenpted theft. There were four to […]

Shell reopens Trans Nigeria Pipeline

Shell reopened on May 16 the Trans Nigeria pipeline that feeds Bonny Light crude oil to the export terminal, a spokeswoman said on Monday.

The pipeline, which has the capacity to carry 180,000 barrels of crude oil per day, was closed on May 12 following a leak caused by attenpted theft.

There were four to six days of delays on the pipeline, traders said, which could cause some June-loading cargoes to be deferred to July.

Shell has said it did not declare force majeure on loadings.

 





Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Warning: Undefined variable $post_id in /var/www/nairametrics/wp-content/themes/nairametrics/comments.php on line 134

Leave a Reply

Your email address will not be published. Required fields are marked *